FAQs
More FAQs- How long will it take to have my hard floors coated with urethane?
- How long will it take to have my carpets cleaned at my business?
- Does acrylic have an odour during application?
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. The coating application can be accomplished at a rate of 750 square feet per hour with a two-person crew.
The amount of time will be contingent on the size of the area that needs to be cleaned, the soil levels and the processes used, either low moisture, portable extraction, or truck-mount extraction. A trained ServiceMaster Clean carpet technician will then help you choose a program that best meets your needs and schedule.
Acrylic does have an odour during application, but it is generally mild and usually dissipates within a short period of time.