FAQs
More FAQs- How long will it take to have my hard floors coated with urethane?
- Are there instructions to follow after my hard-surface floors are cleaned?
- Will the application process produce dust?
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. The coating application can be accomplished at a rate of 750 square feet per hour with a two-person crew.
Before you walk on your floors, it’s best to allow a minimum drying time of at least 1 hour. We recommend allowing 24 hours before walking on it with heavy traffic. Be cautious and protect floors from getting wet for 24 hours after application of either finish as it is not thoroughly cured yet. You can return furniture to your floors (with suggested use of felt pads) after 12 hours and return rugs to floors after 12 hours.
Our finish removal and floor preparation procedures are all done wet or damp to help minimize the generation of airborne dust.